Target state separated from daily execution
Product 07 / 09
BFLD Operating Model
Convert the accepted foundation into an executable and verifiable operational model.
It transforms the accepted target state into processes, decisions, interfaces, data, and controls that the organization can execute, measure, and evolve.
Requires Foundation acceptance within the perimeter.Install the operational modelFrom change design to work in use.
01 / Operational problem
The target state has been accepted, but there is still no integrated architecture that explains how work traverses functions, decisions, data, and controls in daily operations.
Undefined interfaces between functions
Processes depend on informal coordination
02 / Operational change
What needs to change at work.
Conceptual target state
→Executable flows, roles, and interfacesDecisions and work data separated
→Decision-making rights and information embedded in the flowPaper-approved model
→Representative scenarios tested and commissioned03 / BFLD Engineering
How the product organizes this problem.
The Operating Model starts from the decisions and capabilities defined in the Foundation to design flows, roles, interfaces, information, controls, and cadences, and then tests the set in the representative work.
- 01Design the flow
Define end-to-end work, interfaces, inputs, outputs, and exceptions.
- 02Install governance
Connect roles, decisions, data, controls, and managerial cadence.
- 03Test in operation
Run representative scenarios, resolve frictions, and commission the model.
04 / Public capability
What comes into existence.
- 01
Design processes and end-to-end interfaces
- 02
Define roles and decision-making rights.
- 03
Connect data and controls to the flow
- 04
Organize management cadences
- 05
Test and commission the model in use
05 / Location in the system
Transforms the accepted foundation into real operating mechanisms. It is an extension of Foundation and depends on its perimeter, decisions, and target state.
Understand the required foundation ↗06 / For whom and when
Roles and situations, not generic sectors.
when the target state needs to become executable work
when interfaces and decisions cross areas
when the accepted foundation needs to be converted into operation
07 / Evidence and limit
What this capacity does not authorize to claim.
The model can only be considered installed after testing and acceptance in the representative work. Diagrams and documents, in isolation, do not prove operational adoption.
Adequacy, perimeter, acceptance criteria, and necessary evidence are defined before any commitment to results.Next decision
Install the operational model
Share only the initial context. Do not send documents, evidence, or confidential data via the public form.
Discuss this challenge ↗